An Alternative Method of Estimating Piping Construction Projects
This research involves developing a project management system for the piping construction projects. Piping construction as a part of mechanical package usually takes over 30% of total efforts for the industrial construction projects, thus is typically recognized as a critical work scope for the simi...
Gespeichert in:
Veröffentlicht in: | Applied Mechanics and Materials 2012-05, Vol.166-169, p.1131-1136 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This research involves developing a project management system for the piping construction projects. Piping construction as a part of mechanical package usually takes over 30% of total efforts for the industrial construction projects, thus is typically recognized as a critical work scope for the similar kinds of construction projects. Therefore, the piping construction under budget and within schedule is one of the crucial tasks for management, and it takes accurate prediction of performance throughout the project execution process. The researchers suggest an alternative model be utilized to accurately forecast piping work efforts required for the piping construction. The model developed incorporates difficulty factors to estimate the level of efforts more accurately and the validation of the model is in progress. The alternative method of forecast may improve the accuracy significantly. |
---|---|
ISSN: | 1660-9336 1662-7482 1662-7482 |
DOI: | 10.4028/www.scientific.net/AMM.166-169.1131 |