Prediction of the Maximum Riverbed Erosion Depth nearby the River-Crossing Tunnel in Nanchang Reach of Ganjiang River
Nanchang rail transit project line1 was programmed to drill through the Ganjiang river bottom of the reach approximately 700m downstream from the Nanchang Bridge. The prediction of maximum erosion depth of the river bed at the tunnel location was strongly needed. This paper described the composition...
Gespeichert in:
Veröffentlicht in: | Applied Mechanics and Materials 2012-10, Vol.212-213, p.130-136 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Nanchang rail transit project line1 was programmed to drill through the Ganjiang river bottom of the reach approximately 700m downstream from the Nanchang Bridge. The prediction of maximum erosion depth of the river bed at the tunnel location was strongly needed. This paper described the composition and evolution of the river bed in the engineering reach, established a 2-D flow and sediment mathematical model to calculate and analyze the river bed evolution at the tunnel location, selected the typical hydrological years of erosion calculation, catastrophic floods and a long series of hydrological years as the hydrological conditions, and finally obtained the maximum erosion depth under different hydrological conditions. These results will provide technical reference for the tunnel design. |
---|---|
ISSN: | 1660-9336 1662-7482 1662-7482 |
DOI: | 10.4028/www.scientific.net/AMM.212-213.130 |