Study of the Construction Plan Bid Assessment Method of the Coal Mine Project Based on Entropy-Weight Method
In order to choose the optimal construction scheme in the coal mine construction project, this paper establishes evaluation indexes and applies entropy weight method to determine the objective weight of evaluation index based on the expert scoring so that the evaluation results are more consistent w...
Gespeichert in:
Veröffentlicht in: | Applied Mechanics and Materials 2013-01, Vol.275-277, p.2748-2751 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In order to choose the optimal construction scheme in the coal mine construction project, this paper establishes evaluation indexes and applies entropy weight method to determine the objective weight of evaluation index based on the expert scoring so that the evaluation results are more consistent with the actual situation. This method solves the drawbacks that the evaluation indexes depend on the subjective assumptions too much and provide an effective method for choosing the optimal bid scheme of the coal mine construction. |
---|---|
ISSN: | 1660-9336 1662-7482 1662-7482 |
DOI: | 10.4028/www.scientific.net/AMM.275-277.2748 |