Deformation Monitoring and Data Analysis for Metro Construction with Mining Method in Dalian

Based on a subway tunnel construction, the construction method was introduced. The ground subsidence, crown settlement and convergence displacement caused by the cut tunnel are monitored during the tunneling construction and the results of monitoring data for them are analyzed. This technology wells...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied Mechanics and Materials 2013-08, Vol.353-356, p.1604-1608
Hauptverfasser: Liu, Li Sheng, Bai, Guang Bin, Zhao, Jie
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Based on a subway tunnel construction, the construction method was introduced. The ground subsidence, crown settlement and convergence displacement caused by the cut tunnel are monitored during the tunneling construction and the results of monitoring data for them are analyzed. This technology wells to guide the tunnel-entering construction effectively and avoid the tunnel-entering construction process prone to landslides, thus ensuring the safety of the tunnel construction and will guiding the future construction.
ISSN:1660-9336
1662-7482
1662-7482
DOI:10.4028/www.scientific.net/AMM.353-356.1604