Concrete Crack Control in Monolithic Concrete Bed Construction of High-Speed Railway in Northwest Area of China

There were some reasons which cause the concrete cracks in monolithic concrete bed construction of high-speed railway. In this paper, combined with the specific situation of monolithic concrete bed construction of high-speed railway in northwest area of China, the states and causes of two kinds of c...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied Mechanics and Materials 2013-09, Vol.405-408, p.3081-3085
Hauptverfasser: Zhu, Yan Peng, Tang, Xian Zhou, Tang, Xian Xi, Guo, Wei
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:There were some reasons which cause the concrete cracks in monolithic concrete bed construction of high-speed railway. In this paper, combined with the specific situation of monolithic concrete bed construction of high-speed railway in northwest area of China, the states and causes of two kinds of cracks in monolithic concrete bed of high-speed railway were analyzed, the concrete cracking control measures were discussed from the concrete mixture ratio, construction technology and maintenance measures and other aspects, and the corresponding views were put forward. The study results had the important guiding significance on crack controls of concrete structure during the construction process of northwest area.
ISSN:1660-9336
1662-7482
1662-7482
DOI:10.4028/www.scientific.net/AMM.405-408.3081