Examination of the Optimal Equipment Planning Model of Heat and Power

In the small-scale heat and power system like the micro grid, customers request the optimal equipment composition and optimal driving plan that can reduce the cost for introducing and driving generators and carbon-dioxide emissions, in consideration of the heat and power load in the area and the can...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Denki Gakkai ronbunshi. B, Enerugi, denki kiki, denryoku 2008/01/01, Vol.128(1), pp.187-192
Hauptverfasser: Hayashi, Takanori, Funabashi, Toshihisa, Okuno, Yoshimichi, Hoshi, Yasuyuki
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In the small-scale heat and power system like the micro grid, customers request the optimal equipment composition and optimal driving plan that can reduce the cost for introducing and driving generators and carbon-dioxide emissions, in consideration of the heat and power load in the area and the candidate of equipment. In this paper, the optimal equipment planning is modeled as a mixed integer linear programming. With this model we can calculate the equipment composition that put out the optimal output pattern according to the load pattern of given heat and power, and the list of the prepared equipment. To express the lower bound of the operating power of the generator, our model has a lot of integer variables, but we adjusted division of time to drive the generator by the load pattern, so we can solve that by a branch-and-bound approach in effective time.
ISSN:0385-4213
1348-8147
DOI:10.1541/ieejpes.128.187