Analysis of the Pricing Process in Electricity Market using Multi-Agent Model

Many electric utilities world-wide have been forced to change their ways of doing business, from vertically integrated mechanisms to open market systems. We are facing urgent issues about how we design the structures of power market systems. In order to settle down these issues, many studies have be...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Denki Gakkai ronbunshi. B, Enerugi, denki kiki, denryoku 2004, Vol.124(2), pp.281-290
Hauptverfasser: Shimomura, Takahiro, Saisho, Yuichi, Fujii, Yasumasa, Yamaji, Kenji
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Many electric utilities world-wide have been forced to change their ways of doing business, from vertically integrated mechanisms to open market systems. We are facing urgent issues about how we design the structures of power market systems. In order to settle down these issues, many studies have been made with market models of various characteristics and regulations. The goal of modeling analysis is to enrich our understanding of fundamental process that may appear. However, there are many kinds of modeling methods. Each has drawback and advantage about validity and versatility. This paper presents two kinds of methods to construct multi-agent market models. One is based on game theory and another is based on reinforcement learning. By comparing the results of the two methods, they can advance in validity and help us figure out potential problems in electricity markets which have oligopolistic generators, demand fluctuation and inelastic demand. Moreover, this model based on reinforcement learning enables us to consider characteristics peculiar to electricity markets which have plant unit characteristics, seasonable and hourly demand fluctuation, real-time regulation market and operating reserve market. This model figures out importance of the share of peak-load-plants and the way of designing operating reserve market.
ISSN:0385-4213
1348-8147
DOI:10.1541/ieejpes.124.281