Operation Tests for SN Transition Superconducting Fault Current Limiter in the Power System Simulator

One of important problems to be solved in Japanese trunk transmission systems is the reduction of short circuit capacity. As this countermeasure, double buses are split into two buses in some substations. In recent years, dispersed generators are introduced in lower voltage classes due to the introd...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Denki Gakkai ronbunshi. B, Enerugi, denki kiki, denryoku 2004, Vol.124(11), pp.1336-1342
Hauptverfasser: Kameda, Hideyuki, Torii, Shinji, Kumano, Teruhisa, Sakaki, Hisayoshi, Kubota, Hiroshi, Yasuda, Kenji
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:One of important problems to be solved in Japanese trunk transmission systems is the reduction of short circuit capacity. As this countermeasure, double buses are split into two buses in some substations. In recent years, dispersed generators are introduced in lower voltage classes due to the introduction of the electricity deregulation. In such a distribution system as many dispersed generators are introduced, it is a possibility that the fault current becomes beyond the breaking capacity at the occurrence of short circuit. Introduction of superconducting fault current limiters into a power system is very effective as one of the means to solve the above-mentioned problem, and we have studied on the effective introduction method of them and setting method of their parameters. This paper describes the results of the operation tests for SN transition type of a superconducting fault current limiter using 3 phases of FCL modules against various kinds of system faults or inrush current in the Power System Simulator installed at CRIEPI.
ISSN:0385-4213
1348-8147
DOI:10.1541/ieejpes.124.1336