Status of Superconducting Magnet System for J-PARC Neutrino Beam Line

The Great East Japan earthquake that occurred on March 11, 2011 resulted in devastating damages to J-PARC. Although damages to the superconducting magnet system for the J-PARC neutrino beam line appeared to be relatively small, a long recovery procedure was required to resume the operation. Except f...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on applied superconductivity 2013-06, Vol.23 (3), p.4001506-4001506
Hauptverfasser: Ogitsu, T., Makida, Y., Nakamoto, T., Sasaki, K., Araoka, O., Fujii, Y., Iida, M., Ishii, T., Iwasaki, R., Kimura, N., Kobayashi, T., Nakadaira, T., Nakayoshi, K., Ohhata, H., Okamura, T., Okada, R., Sakashita, K., Shibata, M., Sugano, M., Yoshida, M., Anerella, M., Escallier, J., Ganetis, G., Ghosh, A., Gupta, R., Muratore, J., Parker, B., Wanderer, P., Jain, A., Charrier, J., Boussuge, T., Kakuno, H.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The Great East Japan earthquake that occurred on March 11, 2011 resulted in devastating damages to J-PARC. Although damages to the superconducting magnet system for the J-PARC neutrino beam line appeared to be relatively small, a long recovery procedure was required to resume the operation. Except for this long shutdown period, the system has been operated stably ensuring good accumulation of the physics data. The paper reports on the operation status including the damages by the earthquake and its recovery process. Repair of the insufficient cooling of steering corrector coils, which was present prior to the earthquake, was also performed during the recovery process. The paper also reports on the repair.
ISSN:1051-8223
1558-2515
DOI:10.1109/TASC.2012.2234821