Manufacturing and Operation of the Magnetic Septa for the Slow Beam Extraction From the J-PARC 50 GeV Proton Synchrotron

The magnetic septa have been developed for the slow beam extraction from the 50 GeV Proton Synchrotron to the Hadron Experimental Hall at J-PARC (Japan Proton Accelerator Research Complex). The magnetic septa consist of two thin magnetic septa, four medium thick magnetic septa and four thick magneti...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on applied superconductivity 2010-06, Vol.20 (3), p.336-339
Hauptverfasser: Muto, Ryotaro, Arakaki, Yoshitugu, Fan, Kuanjun, Ishii, Koji, Kiyomichi, Akio, Kobayashi, Hitoshi, Matsumoto, Hiroshi, Murasugi, Shigeru, Nakagawa, Hidetoshi, Odagiri, Jun-ichi, Okamura, Katsuya, Sakai, Izumi, Sato, Hikaru, Sawada, Shin'ya, Shirakabe, Yoshihisa, Tanaka, Kazuhiro, Tokumoto, Shuichi, Tomizawa, Masahito, Yanaoka, Eiichi
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The magnetic septa have been developed for the slow beam extraction from the 50 GeV Proton Synchrotron to the Hadron Experimental Hall at J-PARC (Japan Proton Accelerator Research Complex). The magnetic septa consist of two thin magnetic septa, four medium thick magnetic septa and four thick magnetic septa. The typical operating current is 3000 A and the total kick angle is 77 mrad with the 30 GeV proton beam. All parts of the thin and of the medium thick septum magnets are made of inorganic materials to resist high radiation environment. The positions of the thin and medium thick septa can be aligned remotely in the horizontal range of ±5 mm, which enables us to minimize the beam loss at the magnetic septum section. The septa were installed in the synchrotron ring in December, 2008, after a test at KEK (High Energy Accelerator Research Organization), and were successfully operated in the beam time for the slow beam extraction in January and February, 2009, which resulted in the first 30 GeV slow extracted beam delivery to the Hadron Experimental Hall.
ISSN:1051-8223
1558-2515
DOI:10.1109/TASC.2010.2040255