Designing the closed loop elements of a. material requirements planning system in a low volume, make-to-order company (with case study)

This paper describes how material requirements planning (MRP) can provide a working solution to job shop scheduling problems. In particular, the critical factors relating to resource and capacity management are examined within a low volume, make-to-order company. A rough cut capacity planning (RCCP)...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production research 1988-07, Vol.26 (7), p.1141-1159
Hauptverfasser: McAREAVEY, D., HOEY, J., LEONARD, R.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper describes how material requirements planning (MRP) can provide a working solution to job shop scheduling problems. In particular, the critical factors relating to resource and capacity management are examined within a low volume, make-to-order company. A rough cut capacity planning (RCCP) module is described which, when used with a detailed capacity management methodology, has enabled the collaborating company to achieve substantial savings in work-in-progress (WIP), a marked reduction in machining lead times and viable control over customer lead times. Finally, an MRP production methodology is described, which allows such concepts as unit cost justification and machine utilisation to be re-examined.
ISSN:0020-7543
1366-588X
DOI:10.1080/00207548808947931