Development of ITER TF Coil in Japan

Japan Atomic Energy Agency (JAEA) started sub- and full-scale trials to qualify and optimize manufacturing procedure of ITER TF coil from March 2009 under the contract with Toshiba. As major outcome of these trials, feasibility of high accuracy of winding, prediction of the conductor elongation due...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on applied superconductivity 2012-06, Vol.22 (3), p.4200404-4200404
Hauptverfasser: Koizumi, N., Matsui, K., Hemmi, T., Takano, K., Chida, Y., Iguchi, M., Nakajima, H., Shimada, M., Oosemochi, K., Makino, Y., Nagamoto, Y., Esaki, K.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Japan Atomic Energy Agency (JAEA) started sub- and full-scale trials to qualify and optimize manufacturing procedure of ITER TF coil from March 2009 under the contract with Toshiba. As major outcome of these trials, feasibility of high accuracy of winding, prediction of the conductor elongation due to heat treatment and radial plate manufacture is confirmed. Therefore, JAEA can mostly establish manufacturing plan for the TF coil and then, start the first TF coil procurement from 2013, following to full demonstration through manufacturing a dummy double-pancake in 2012.
ISSN:1051-8223
1558-2515
DOI:10.1109/TASC.2011.2176697