Fire-Tube Boiler Test Burn on Coal-Water Fuel

The Energy and Environmental Research Corporation (EER), in cooperation with the University of Alabama (UA) and the Mining Division of Jim Walter Resources, Inc. (JWRI), was awarded a U.S. Department of Energy (DOE) contract to retrofit an existing fire-tube boiler to burn coal-water fuel (CWF) A fi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Energy Sources 1998-01, Vol.20 (1), p.11-24
Hauptverfasser: HALE, BRADLEY MITCHEL, ARNOLD, DAVID W.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The Energy and Environmental Research Corporation (EER), in cooperation with the University of Alabama (UA) and the Mining Division of Jim Walter Resources, Inc. (JWRI), was awarded a U.S. Department of Energy (DOE) contract to retrofit an existing fire-tube boiler to burn coal-water fuel (CWF) A fire-tube boiler on the UA campus was retrofitted, and the CWF was made from Blue Creek Coal fines produced by the Mining Division of JWRI, which is located 45 min from the UA campus. The boiler was successfully operated for 800 hours on CWF. Operating with CWF required a boiler derating of 20% and natural gas as a support fuel. This article describes the test burn on CWF, including combustion characteristics of JWRI CWF, boiler efficiency, combustion temperatures, boiler derating, and emission quality of the flue gas. Also reported is a brief summary of the economic analysis of conversion from natural gas to CWF.
ISSN:0090-8312
1521-0510
DOI:10.1080/00908319808970039