The status of VIRGO
VIRGO interferometer commissioning started in September 2003. The complete lock of the interferometer was achieved in October 2004 via several steps. The main commissioning activity deals with improvements in the interferometer stability and sensitivity. The status of the advancement of VIRGO and th...
Gespeichert in:
Veröffentlicht in: | Classical and quantum gravity 2006-04, Vol.23 (8), p.S63-S69 |
---|---|
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | VIRGO interferometer commissioning started in September 2003. The complete lock of the interferometer was achieved in October 2004 via several steps. The main commissioning activity deals with improvements in the interferometer stability and sensitivity. The status of the advancement of VIRGO and the short-term plans are discussed here |
---|---|
ISSN: | 0264-9381 1361-6382 |
DOI: | 10.1088/0264-9381/23/8/S09 |