LAMPF Dual-Energy Operation

The Los Alamos Meson Physics Facility (LAMPF) operated with simultaneous H+ and H- beams until June 1980, when a method of providing a variable energy H- beam as well as a full-energy H+ beam was brought into use. The scheme is based on time sharing between H+ and H- beam pulses. It is now possible...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on nuclear science 1981-01, Vol.28 (3), p.2910-2911
Hauptverfasser: Hagerman, D. C., Hill, R. E., Hunter, W. T., Macek, R. J., van Dyck, O. B.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The Los Alamos Meson Physics Facility (LAMPF) operated with simultaneous H+ and H- beams until June 1980, when a method of providing a variable energy H- beam as well as a full-energy H+ beam was brought into use. The scheme is based on time sharing between H+ and H- beam pulses. It is now possible to provide H- beams with energy as low as 300 MeV along with the usual 800-MeV H+ beams. The method requires a reduction in duty factor of the H+ and H- beams; however, the total duty factor has been increased to 9% which compensates in large measure for the reduction due to dual-energy operation. The necessary modifications to the beam switchyard and accelerator timing systems are described.
ISSN:0018-9499
1558-1578
DOI:10.1109/TNS.1981.4331956