138 kV shunt capacitor research bank-design and experience
A substation capacitor bank incorporating a number of innovations was installed at the Poston Station (Columbus Southern Power Company) and commissioned July 1988. A description is given of the installation, including a discussion of the various innovations, comments on the operating experience thro...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on power delivery 1990-01, Vol.5 (1), p.337-342 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A substation capacitor bank incorporating a number of innovations was installed at the Poston Station (Columbus Southern Power Company) and commissioned July 1988. A description is given of the installation, including a discussion of the various innovations, comments on the operating experience through mid-January 1989, and observations from a staged fault test on November 10, 1988.< > |
---|---|
ISSN: | 0885-8977 1937-4208 |
DOI: | 10.1109/61.107294 |