Installation and first operation of the International Fusion Materials Irradiation Facility injector at the Rokkasho site

The International Fusion Materials Irradiation Facility (IFMIF) linear IFMIF prototype accelerator injector dedicated to high intensity deuteron beam production has been designed, built, and tested at CEA/Saclay between 2008 and 2012. After the completion of the acceptance tests at Saclay, the injec...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Review of scientific instruments 2016-02, Vol.87 (2), p.02A726-02A726
Hauptverfasser: Gobin, Raphael, Bogard, Daniel, Bolzon, Benoit, Bourdelle, Gilles, Chauvin, Nicolas, Chel, Stéphane, Girardot, Patrick, Gomes, Adelino, Guiho, Patrice, Harrault, Francis, Loiseau, Denis, Lussignol, Yves, Misiara, Nicolas, Roger, Arnaud, Senée, Franck, Valette, Matthieu, Cara, Philippe, Duglué, Daniel, Gex, Dominique, Okumura, Yoshikazu, Ayala, Juan Marcos, Knaster, Juan, Marqueta, Alvaro, Kasugai, Atsushi, O'Hira, Shigeru, Shinto, Katsuhiro, Takahashi, Hiroki
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The International Fusion Materials Irradiation Facility (IFMIF) linear IFMIF prototype accelerator injector dedicated to high intensity deuteron beam production has been designed, built, and tested at CEA/Saclay between 2008 and 2012. After the completion of the acceptance tests at Saclay, the injector has been fully sent to Japan. The re-assembly of the injector has been performed between March and May 2014. Then after the check-out phase, the production of the first proton beam occurred in November 2014. Hydrogen and deuteron beam commissioning is now in progress after having proceeded with the final tests on the entire injector equipment including high power diagnostics. This article reports the different phases of the injector installation pointing out the safety and security needs, as well as the first beam production results in Japan and chopper tests. Detailed operation and commissioning results (with H(+) and D(+) 100 keV beams) are reported in a second article.
ISSN:0034-6748
1089-7623
DOI:10.1063/1.4932977