Polarization Measurements of RHIC-pp RUN05 Using CNI pC-Polarimeter

The 2005 run (RUN05) was the first extended operation of the polarized RHIC-pp program. Throughout 3 months of running, polarization measurements were regularly executed every 2 ~ 3 hours during the beams at storage energy 100GeV using RHIC pC-polarimeters. These measurements were performed under di...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Nakagawa, I, Alekseev, I, Bravar, A, Bunce, G, Dhawan, S, Eyser, K O, Gill, R, Haeberli, W, Huang, H, Jinnouchi, O, Makdisi, Y, Nass, A, Okada, H, Stephenson, E, Svirida, D, Wise, T, Wood, J, Zelenski, A
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The 2005 run (RUN05) was the first extended operation of the polarized RHIC-pp program. Throughout 3 months of running, polarization measurements were regularly executed every 2 ~ 3 hours during the beams at storage energy 100GeV using RHIC pC-polarimeters. These measurements were performed under different beam conditions, i.e., intensity, emittance, backgrounds, cumulated radiation damage on detectors and so on. The stability of measurements under these various conditions is a major concern and is discussed in detail.
ISSN:0094-243X
1551-7616
DOI:10.1063/1.2750924