Polarization Measurements of RHIC-pp RUN05 Using CNI pC-Polarimeter
The 2005 run (RUN05) was the first extended operation of the polarized RHIC-pp program. Throughout 3 months of running, polarization measurements were regularly executed every 2 ~ 3 hours during the beams at storage energy 100GeV using RHIC pC-polarimeters. These measurements were performed under di...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The 2005 run (RUN05) was the first extended operation of the polarized RHIC-pp program. Throughout 3 months of running, polarization measurements were regularly executed every 2 ~ 3 hours during the beams at storage energy 100GeV using RHIC pC-polarimeters. These measurements were performed under different beam conditions, i.e., intensity, emittance, backgrounds, cumulated radiation damage on detectors and so on. The stability of measurements under these various conditions is a major concern and is discussed in detail. |
---|---|
ISSN: | 0094-243X 1551-7616 |
DOI: | 10.1063/1.2750924 |