Performance of the TLS Vacuum Systems Operated at 300 mA of Top-up Mode

The 1.5 GeV Taiwan Light Source (TLS) has been upgraded, subsequently increasing the beam current from 200 mA to 300 mA. Additionally, the operational mode changed from decay mode to the top-up mode in 2006 after the cavities were replaced by a superconducting RF cavity and the chambers in the injec...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Hsiung, G Y, Chan, C K, Hsueh, H P, Yang, T L, Chang, C C, Hsu, S N, Yang, C Y, Chen, C L, Chen, J R
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The 1.5 GeV Taiwan Light Source (TLS) has been upgraded, subsequently increasing the beam current from 200 mA to 300 mA. Additionally, the operational mode changed from decay mode to the top-up mode in 2006 after the cavities were replaced by a superconducting RF cavity and the chambers in the injection straight section with new ones in 2005. The operation at 400 mA has been tested to ensure regular operations of a stored beam at 300 mA. Efforts have been made to replace the interlock systems, spare parts, utility systems and signal archiving systems to ensure the reliable operation of the storage ring and ultimately avoid damage incurred to the system. The beam test at a high current and the performance of the vacuum system will be described.
ISSN:0094-243X
1551-7616
DOI:10.1063/1.2436007