Beam Diagnostics for the BNL Energy Recovery Linac Test Facility

An Energy Recovery Linac (ERL) test facility is presently under construction at BNL. The goals of this test facility are first to demonstrate stable intense CW electron beam with parameters typical for the RHIC e-cooling project (and potentially for eRHIC), second to test novel elements of the ERL (...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AIP conference proceedings 2004-01, Vol.732 (1), p.232-237
Hauptverfasser: Cameron, Peter, Ben-Zvi, Ilan, Blaskiewicz, Michael, Brennan, Michael, Connolly, Roger, Dawson, William, Degen, Chris, Dellapenna, Al, Gassner, David, Kesselman, Martin, Kewish, Jorg, Litvinenko, Vladimir, Mead, Joseph, Oerter, Brian, Russo, Tom, Vetter, Kurt, Yakimenko, Vitaly
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:An Energy Recovery Linac (ERL) test facility is presently under construction at BNL. The goals of this test facility are first to demonstrate stable intense CW electron beam with parameters typical for the RHIC e-cooling project (and potentially for eRHIC), second to test novel elements of the ERL (high current CW photo-cathode, superconducting RF cavity with HOM dampers, and feedback systems), and finally to test lattice dependence of stability criteria. Planned diagnostics include position monitors, loss monitors, transverse profile monitors (both optical and wires), scrapers/halo monitors, a high resolution differential current monitor, phase monitors, an energy spread monitor, and a fast transverse monitor (for beam break-up studies and the energy feedback system). We discuss diagnostics challenges that are unique to this project, and present preliminary system specifications. In addition, we include a brief discussion of the timing system.
ISSN:0094-243X
1551-7616
DOI:10.1063/1.1831152