Thermoelectric topping cycles for power plants to eliminate cooling water consumption

[Display omitted] •Complete system analysis of a thermoelectric topping generator in a power plant.•Topping application does not require high-ZT thermoelectrics to be effective.•The improved efficiency can be used to replace water cooling with air cooling.•The topping generator is superior to flue g...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Energy conversion and management 2014-08, Vol.84 (C), p.244-252
Hauptverfasser: Yazawa, Kazuaki, Hao, Menglong, Wu, Bin, Silaen, Armin K., Zhou, Chenn Qian, Fisher, Timothy S., Shakouri, Ali
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:[Display omitted] •Complete system analysis of a thermoelectric topping generator in a power plant.•Topping application does not require high-ZT thermoelectrics to be effective.•The improved efficiency can be used to replace water cooling with air cooling.•The topping generator is superior to flue gas waste heat recovery in efficiency and less materials. This work shows that thermoelectric (TE) topping generators can add 4–6% to the overall system efficiency for advanced supercritical steam turbines (Rankine cycle) that nominally generate power with 40–42% efficiency. The analysis then considers how this incremental topping energy can replace cooling water flow with air-cooled condensers (ACC) while maintaining current power output and plant efficiency levels with commensurate economic benefit ($/kWh). The simulated TE modules are located inside a coal-fired boiler wall constructed of wet steam tubes. The topping TE generator employs non-toxic and readily available materials with a realistic figure-of-merit range (ZT=0.5–1.0). Detailed heat transfer and thermal analyses are included for this high-temperature TE application (e.g., 800K for the cold side reservoir). With the tube surface enhanced by fins, the TE elements are designed to perform optimally through a distributed configuration along the wall-embedded steam tubes that are more than 20m high. The distribution of the gas temperature in the furnace along the wall height is predicted by thermo-fluid dynamic analysis. This foundational design and analysis study produces overall realistic efficiency predictions in accordance with temperature–entropy analysis for superheated Rankine cycles. Lastly, the approach also allows for the addition of waste heat recovery from the flue gas. The analysis shows that the power output from the topping TE generator is significantly larger, compared to that from the waste heat recovery, due to the larger available temperature difference.
ISSN:0196-8904
1879-2227
DOI:10.1016/j.enconman.2014.04.031