Monitoring Analysis and Numerical Simulation of the Land Subsidence in Linear Engineering Areas

Non-uniform land subsidence can cause subgrade deformation and threaten the safety of linear projects such as high-speed railways. The Lunan high-speed railway is taken as the research background. Combined with the hydrogeological and engineering geological conditions, the regional land subsidence i...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:KSCE Journal of Civil Engineering 2021, 25(7), , pp.2674-2689
Hauptverfasser: Jia, Chao, Yang, Xiao, Wu, Jing, Ding, Pengpeng, Bian, Chao
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Non-uniform land subsidence can cause subgrade deformation and threaten the safety of linear projects such as high-speed railways. The Lunan high-speed railway is taken as the research background. Combined with the hydrogeological and engineering geological conditions, the regional land subsidence is analyzed by the combined method of the differential interferometric synthetic aperture radar (D-InSAR) and small baseline subset interferometric synthetic aperture radar (SBAS-InSAR), which is verified by using precise leveling and GPS monitoring data. The accurate land subsidence analysis of large-scale linear engineering is realized. The distribution situation and change laws of land subsidence in linear engineering areas are revealed. Then, a three-dimensional coupled numerical model of land subsidence along a large-scale linear project is established by using the finite difference method. The spatial distribution characteristics of land subsidence in the linear engineering area are quantitatively analyzed and predicted. The main factors affecting land subsidence and the degree of land subsidence are discussed while keeping the pumping rate constant. The results show that: 1) The combined method of D-InSAR and SBAS-InSAR has high accuracy in the land subsidence monitoring of linear engineering. 2) There are five non-uniform settlement funnels along the Lunan high-speed railway. The groundwater over-extraction and coal mining are the main reasons for the land subsidence. 3) Realizing water source conversion and reduce groundwater exploitation are the main factors in linear engineering areas as soon as possible.
ISSN:1226-7988
1976-3808
DOI:10.1007/s12205-021-1823-x