Design and construction of the GK immersed tunnel of Busan-Geoje Fixed Link Project
The GK immersed tunnel as a part of Busan-Geoje Fixed Link Project, is the first attempt in Korea. In spite of existing of many difficulties in construction like the absent of construction cases in Korea, the connection work under approximately 50 m below sea level and weak ground condition, etc., n...
Gespeichert in:
Veröffentlicht in: | 터널과 지하공간, 19(2) 2009, 19(2), 79, pp.71-76 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The GK immersed tunnel as a part of Busan-Geoje Fixed Link Project, is the first attempt in Korea. In spite of existing of many difficulties in construction like the absent of construction cases in Korea, the connection work under approximately 50 m below sea level and weak ground condition, etc., now eight caissons were installed successfully on the accurate position and we are going to install upto the twelfth caisson in this year. The purpose of this paper is to introduce design and construction conditions of the GK immersed tunnel to advise the tunnel designers who will handle the similar project.
The GK immersed tunnel as a part of Busan-Geoje Fixed Link Project, is the first attempt in Korea. In spite of existing of many difficulties in construction like the absent of construction cases in Korea, the connection work under approximately 50 m below sea level and weak ground condition, etc., now eight caissons were installed successfully on the accurate position and we are going to install upto the twelfth caisson in this year. The purpose of this paper is to introduce design and construction conditions of the GK immersed tunnel to advise the tunnel designers who will handle the similar project. KCI Citation Count: 0 |
---|---|