싱가포르 포트캐닝 전석층에 적용된 EPBM의 설계 및 시공
This paper introduces the design and operational considerations for TBM tunneling in boulder bed which poses significant problems in terms of advance rate and machine wear. Managing these problems is difficult since normal soil investigation techniques do not accurately predict the presence and freq...
Gespeichert in:
Veröffentlicht in: | 터널과 지하공간, 25(5) 2015, 25(5), 118, pp.417-422 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | kor |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper introduces the design and operational considerations for TBM tunneling in boulder bed which poses significant problems in terms of advance rate and machine wear. Managing these problems is difficult since normal soil investigation techniques do not accurately predict the presence and frequency of boulders. This has leads to considerable extra costs and delays during construction. In this paper, EPBM design and operational parameters, cutter wear characteristics and soil conditioning method in soft ground condition were studied and key successes were highlighted for future projects in similar ground condition. 본 논문은 TBM을 이용한 터널 굴착에서 커터의 마모 및 파손, 그에 따른 굴착속도 저하와 커터교체에 따른 공기 지연 등으로 인하여 프로젝트 전반에 심각한 영향을 미치는 전석층 지반 터널링에 관한 내용으로, 매우 조밀하고 단단한 상태의 점토지반에 강한 강도를 지니는 암석을 포함하는 싱가포르 포트캐닝 볼더베드(Fort Canning Boulder Bed, FCBB)에서의 터널링 경험을 바탕으로 볼더층을 통과하게 되는 토압식 쉴드TBM의 설계 및 시공 시 고려해야 할 주요 사항 및 볼더지반에서의 커터 마모 및 파손 특성, 점토 및 암석이 혼재된 지반에서의 쏘일 컨디셔닝 등의 내용을 기술하였으며, 향후 유사 지반에서의 터널링 프로젝트에 참고가 되길 기대한다. |
---|---|
ISSN: | 1225-1275 2287-1748 |