광 페룰 에폭시 자동주입 시스템 설계 및 성능시험에 관한 연구

Weakness process can be called ferrule array and epoxy filling process at connector manufacturing process, and a lot of problems happen as think as general manufacturing process at early investment. Wished to improve this and working environment mend of worker on childhood(planning phase) and proble...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:한국생산제조학회지 2008, 17(6), , pp.118-123
1. Verfasser: 곽이구(Lee Ku Kwac)
Format: Artikel
Sprache:kor
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Weakness process can be called ferrule array and epoxy filling process at connector manufacturing process, and a lot of problems happen as think as general manufacturing process at early investment. Wished to improve this and working environment mend of worker on childhood(planning phase) and problem that is happened at done ferrule array and epoxy injection by emphasis target. By ferrule sorting and improvement of epoxy filling process, bring authoritativeness elevation of product by fraction defective decrease of product by sized work along with productivity elevation. On the other hand, working jigs are various in characteristics of optical connector manufacturing line. There have been lots of restriction in practice because the applicability of this system is only for single type model though the network should be smooth between lines. Thus, it is not only needed the recognition of necessity in industrial line but also the development of automation system arraying ferrule and filling epoxy in the manufacturing process. It is found that the present system development enhances productivity fairly and prevents industrial disaster in the optical connector manufacturing system. KCI Citation Count: 0
ISSN:2508-5093
2508-5107