풍력발전기용 피치/요 베어링의 시험절차 개발
Test procedure for the design verification of wind turbine pitch and yaw bearings has been developed. Test items were selected to evaluate operational reliability of pitch and yaw bearings by considering loading and operational conditions, and by analyzing the design criteria of pitch and yaw bearin...
Gespeichert in:
Veröffentlicht in: | 한국생산제조학회지 2015, 24(3), , pp.355-362 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | kor |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Test procedure for the design verification of wind turbine pitch and yaw bearings has been developed. Test items were selected to evaluate operational reliability of pitch and yaw bearings by considering loading and operational conditions, and by analyzing the design criteria of pitch and yaw bearings. The developed test items consisted of preliminary test, fatigue load test, extreme load test, low temperature environmental test and dismantling inspection after all the test were completed. Because it reflects the actual operational conditions of the pitch and yaw bearings, the developed test procedure has high reliability and can verify the basic design considerations in the international standard and guidelines. KCI Citation Count: 1 |
---|---|
ISSN: | 2508-5093 2508-5107 |
DOI: | 10.7735/ksmte.2015.24.3.355 |