Estimate of the Effects of Eddy Currents in a Vacuum Chamber Inside the PEFP Switching Magnets
The proton beam user facility of the PEFP (Proton Engineering Frontier Project) is under construction. Two switching magnets are made to distribute 100-MeV and 20-MeV proton beams, extracted from the 100-MeV linac, at 7.5 Hz or 15 Hz. Vacuum chambers should be designed based on consideration of the...
Gespeichert in:
Veröffentlicht in: | Journal of the Korean Physical Society 2011, 59(22), , pp.631-634 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The proton beam user facility of the PEFP (Proton Engineering Frontier Project) is under construction. Two switching magnets are made to distribute 100-MeV and 20-MeV proton beams, extracted from the 100-MeV linac, at 7.5 Hz or 15 Hz. Vacuum chambers should be designed based on consideration of the effects of eddy currents. In this paper, analytical descriptions for various shapes are summarized, and numerical calculations to estimate not only the field attenuation but also the phase delay are presented for a semi-elliptical vacuum chamber and the switching magnet’s operation conditions by using the OPERA code. KCI Citation Count: 0 |
---|---|
ISSN: | 0374-4884 1976-8524 |
DOI: | 10.3938/jkps.59.631 |