쉴드TBM 터널 시공 사례 : 인천도시철도1호선 검단연장선 1공구
The Incheon Metro Line 1 Geomdan Extension Phase 1 is the first project in South Korea where both a roadheader and TBM (Tunnel Boring Machine) are being used together. The shield TBM tunnel section is 1,057 m long, and is mostly composed of rock, including the section beneath the Airport Railroad an...
Gespeichert in:
Veröffentlicht in: | 터널과 지하공간, 34(3) 2024, 34(3), 170, pp.185-195 |
---|---|
Hauptverfasser: | , , , , , , |
Format: | Artikel |
Sprache: | kor |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The Incheon Metro Line 1 Geomdan Extension Phase 1 is the first project in South Korea where both a roadheader and TBM (Tunnel Boring Machine) are being used together. The shield TBM tunnel section is 1,057 m long, and is mostly composed of rock, including the section beneath the Airport Railroad and the Gyeongin Ara Waterway. A 7.8 m earth pressure balance shield TBM was used for tunnel excavation. The average monthly advance rate for both the North and South tracks is 239.1 m, with a maximum monthly advance rate of 334.5 m. This technical article comprehensively evaluates the productivity of the shield TBM, focusing on the TBM excavation performance. Above all, it aims to provide useful reference material for the successful execution of shield TBM tunnel construction. 인천도시철도 1호선 검단연장선 1공구 건설공사는 국내 최초로 로드헤더와 TBM 장비가 함께 적용되었다. 쉴드TBM 터널 구간은 1,057 m이며, 대부분 암반으로 구성 되어있으며 공항철도 및 경인아라뱃길 하부 터널 구간 공사를 포함하고 있다. 굴진을 위해 7.8 m 토압식 쉴드TBM 장비가 투입되었으며, 상·하선 구간의 평균 월굴진율은 239.1 m이고, 최대 월굴진율은 334.5 m이다. 본 기술기사에서는 인천도시철도 1호선 검단연장선 1공구 쉴드TBM 터널 굴진 실적을 중심으로 쉴드TBM의 생산성을 종합적으로 평가해 보았으며, 성공적인 쉴드TBM 터널 공사 수행에 있어서 유용한 자료를 제공하고자 한다. |
---|---|
ISSN: | 1225-1275 2287-1748 |