Investigation of the operating conditions for a full-scale plant for hydrogen production from biomass

In this study, we analyzed the system configuration and operating conditions for a full-scale plant for hydrogen (H 2 ) production from biomass. We considered pretreatment and upgrade processes for generating pure biomethane and the steam methane reforming reaction for H 2 production. The pretreatme...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of mechanical science and technology 2024, 38(4), , pp.2161-2167
Hauptverfasser: Cho, Sang Hoon, Song, Hyoungwoon, Hong, Gi Hoon, Bae, Soojin, Kim, Minsung, Kim, Dong Kyu
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this study, we analyzed the system configuration and operating conditions for a full-scale plant for hydrogen (H 2 ) production from biomass. We considered pretreatment and upgrade processes for generating pure biomethane and the steam methane reforming reaction for H 2 production. The pretreatment of biogas occurs under atmospheric conditions and produces methane and carbon dioxide while capturing various toxic gases such as hydrogen sulfide. After the upgrade process, biomethane with a purity of 98 % is generated via a pressure swing adsorption and membrane separation system. The pure biomethane is then transported to the H 2 production facilities and converted to H 2 gas via steam methane reforming, thereby producing highly pure H 2 (99.995 %). The full-scale plant can produce over 300 kg of H 2 per day with an operating efficiency of over 90 %. The findings from this study can help further the understanding of the operating conditions and system configuration for a full-scale plant for H 2 production plant from biomass.
ISSN:1738-494X
1976-3824
DOI:10.1007/s12206-024-0344-1