Stayed Buckle Cable Recycling for Seismic Upgrading of Super-long-span Concrete Filled Steel Tube Arch Bridges

A seismic upgrading approach for super-large-span upper-deck concrete-filled steel tube arch bridges using the stayed buckle cables (SBCs, which are temporary facilities for construction of long-span arch bridges) was proposed. The arrangement of SBCs most beneficial to the seismic resistance of arc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:KSCE journal of civil engineering 2024, 28(2), , pp.777-786
Hauptverfasser: Ye, Dan, Zhou, Jianting, Zhang, Ruijie, Xu, Lueqin, Jin, Shuangshuang
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A seismic upgrading approach for super-large-span upper-deck concrete-filled steel tube arch bridges using the stayed buckle cables (SBCs, which are temporary facilities for construction of long-span arch bridges) was proposed. The arrangement of SBCs most beneficial to the seismic resistance of arch bridges was determined. The results show that the reasonable arrangement of SBCs can achieve significant seismic performance improvement, reduce the stress demand on the diagonal of the arch rib, and improve the capacity-demand ratios of the weak sections of the arch rib. In upgrading model, the max displacement response of the structure is decreased by 41.3%, the max tensile stress on the diagonal is decreased by 30.1%, the max compression stress demand on the diagonal decreased by 18.0%, the CDRs of sections of the arch ribs are greatly improved.
ISSN:1226-7988
1976-3808
DOI:10.1007/s12205-023-0427-z