2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management U...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: Sillan, Randall K.
Format: Report
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Sillan, Randall K.
description This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.
format Report
fullrecord <record><control><sourceid>nasa_CYI</sourceid><recordid>TN_cdi_nasa_ntrs_20240001135</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>20240001135</sourcerecordid><originalsourceid>FETCH-nasa_ntrs_202400011353</originalsourceid><addsrcrecordid>eNqFkDFPw0AMhcvAgIB_wOARpCLSlDKwpREVFVQgUrFWbuImlu58ke8OlH_PFVXqwMBky-_585PPTvI8y3NYd-pi20HRKxtIoymUTpXqwF8EK0IflTwsbW_IkgQM7ARQGlhKIGV79BQiEQ1UyRM9fFDvNDxCFa1FHcDtYM7O96gtQTX4QBbeetIjcIWckIJS0_gv_dfhhINTlja1WzYErxil7uDdYNg5telqh0ngQ86KQ1q9g0_quE72wnuyWzPAPLJp9pxCCeG6-rYRstnDDbyQCDUDVD3WBCXtY4xhYdLVBi9Gpzs0ni4P9Xx0tXhal8-3gh43EtRv0gfvsyybTKaz6T_yD3-ggi4</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida</title><source>NASA Technical Reports Server</source><creator>Sillan, Randall K.</creator><creatorcontrib>Sillan, Randall K.</creatorcontrib><description>This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.</description><language>eng</language><publisher>Kennedy Space Center</publisher><subject>Environment Pollution</subject><creationdate>2024</creationdate><rights>Copyright Determination: PUBLIC_USE_PERMITTED</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>780,800,4488</link.rule.ids><linktorsrc>$$Uhttps://ntrs.nasa.gov/citations/20240001135$$EView_record_in_NASA$$FView_record_in_$$GNASA$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Sillan, Randall K.</creatorcontrib><title>2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida</title><description>This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.</description><subject>Environment Pollution</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>2024</creationdate><recordtype>report</recordtype><sourceid>CYI</sourceid><recordid>eNqFkDFPw0AMhcvAgIB_wOARpCLSlDKwpREVFVQgUrFWbuImlu58ke8OlH_PFVXqwMBky-_585PPTvI8y3NYd-pi20HRKxtIoymUTpXqwF8EK0IflTwsbW_IkgQM7ARQGlhKIGV79BQiEQ1UyRM9fFDvNDxCFa1FHcDtYM7O96gtQTX4QBbeetIjcIWckIJS0_gv_dfhhINTlja1WzYErxil7uDdYNg5telqh0ngQ86KQ1q9g0_quE72wnuyWzPAPLJp9pxCCeG6-rYRstnDDbyQCDUDVD3WBCXtY4xhYdLVBi9Gpzs0ni4P9Xx0tXhal8-3gh43EtRv0gfvsyybTKaz6T_yD3-ggi4</recordid><startdate>20240229</startdate><enddate>20240229</enddate><creator>Sillan, Randall K.</creator><scope>CYE</scope><scope>CYI</scope></search><sort><creationdate>20240229</creationdate><title>2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida</title><author>Sillan, Randall K.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-nasa_ntrs_202400011353</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>2024</creationdate><topic>Environment Pollution</topic><toplevel>online_resources</toplevel><creatorcontrib>Sillan, Randall K.</creatorcontrib><collection>NASA Scientific and Technical Information</collection><collection>NASA Technical Reports Server</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Sillan, Randall K.</au><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida</btitle><date>2024-02-29</date><risdate>2024</risdate><abstract>This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.</abstract><cop>Kennedy Space Center</cop><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_nasa_ntrs_20240001135
source NASA Technical Reports Server
subjects Environment Pollution
title 2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-11T21%3A44%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-nasa_CYI&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=2022%20Through%20April%202023%20Corrective%20Measures%20Implementation%20and%20Interim%20Measures%20Annual%20Status%20Report:%20Summary%20of%20Biosparge%20System%20Operation%20and%20Maintenance,%20Interim%20Measures%20and%20Monitoring%20Mobile%20Launch%20Platform%20Rehabilitation%20Sites%20/%20Vehicle%20Assembly%20Building%20Area%20(Swmu%20056)%20Kennedy%20Space%20Center,%20Florida&rft.au=Sillan,%20Randall%20K.&rft.date=2024-02-29&rft_id=info:doi/&rft_dat=%3Cnasa_CYI%3E20240001135%3C/nasa_CYI%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true