2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management U...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: Sillan, Randall K.
Format: Report
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.