GFO and JASON Altimeter Engineering Assessment Report. Update: GFO--Acceptance to December 27, 2007, JASON--Acceptance to December 26, 2007. Version 1: June 2008

The purpose of this document is to present and document GEOSAT Follow-On (GFO) performance analyses and results. This is the eighth Assessment Report since the initial report. This report extends the performance assessment since acceptance to 27 December 2007. Since launch, a variety of GFO performa...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Conger, A. M., Hancock, D. W., Hayne, G. S., Brooks, R. L.
Format: Report
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The purpose of this document is to present and document GEOSAT Follow-On (GFO) performance analyses and results. This is the eighth Assessment Report since the initial report. This report extends the performance assessment since acceptance to 27 December 2007. Since launch, a variety of GFO performance studies have been performed: Appendix A provides an accumulative index of those studies. We began the inclusion of analyses of the JASON altimeter after the end of the Topographic Experiment (TOPEX) mission. Prior to this, JASON and TOPEX were compared during our assessment of theTOPEX altimeter. With the end of the TOPEX mission, we developed methods to report on JASON as it relates to GFO.