On-site construction of a point-of-care low-field MRI system in Africa

PurposeTo describe the construction and testing of a portable point-of-care low-field MRI system on site in Africa. MethodsAll of the components to assemble a 50 mT Halbach magnet-based system, together with the necessary tools, were air-freighted from the Netherlands to Uganda. The construction ste...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:NMR in Biomedicine 2023-04, Vol.36 (7)
Hauptverfasser: Obungoloch, J., Muhumuza, I., Teeuwisse, W., Harper, J., Etoku, I., Asiimwe, R., Tusiime, P., Gombya, G., Mugume, C., Namutebi, M.H., Nassejje, M.A., Nayebare, M., Kavuma, J.M., Bukyana, B., Natukunda, F., Ninsiima, P., Muwanguzi, A., Omadi, P., Gijzen, M. van, Schiff, S.J., Webb, A., O'Reilly, T.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PurposeTo describe the construction and testing of a portable point-of-care low-field MRI system on site in Africa. MethodsAll of the components to assemble a 50 mT Halbach magnet-based system, together with the necessary tools, were air-freighted from the Netherlands to Uganda. The construction steps included individual magnet sorting, filling of each ring of the magnet assembly, fine-tuning the inter-ring separations of the 23-ring magnet assembly, gradient coil construction, integration of gradient coils and magnet assembly, construction of the portable aluminum trolley and finally testing of the entire system with an open source MR spectrometer. ResultsWith four instructors and six untrained personnel, the complete project from delivery to first image took approximately 11 days. ConclusionsAn important step in translating scientific developments in the western world from high-income industrialized countries to low- and middle-income countries (LMICs) is to produce technology that can be assembled and ultimately constructed locally. Local assembly and construction are associated with skill development, low costs and jobs. Point-of-care systems have a large potential to increase the accessibility and sustainability of MRI in LMICs, and this work demonstrates that technology and knowledge transfer can be performed relatively seamlessly.
DOI:10.1002/nbm.4917