Optimal procedures for the discrete time cost trade-off problem in project networks

We describe two algorithms, based on dynamic programming logic, for optimally solving the discrete time/cost trade-off problem (DTCTP) in deterministic activity-on-are networks of the CPM type, where the duration of each activity is a discrete, nonincreasing function of the amount of a single nonren...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:European journal of operational research 1996-01, Vol.88 (1), p.50-68
Hauptverfasser: Demeulemeester, Erik, Herroelen, W.S, Elmaghraby, S.E
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 68
container_issue 1
container_start_page 50
container_title European journal of operational research
container_volume 88
creator Demeulemeester, Erik
Herroelen, W.S
Elmaghraby, S.E
description We describe two algorithms, based on dynamic programming logic, for optimally solving the discrete time/cost trade-off problem (DTCTP) in deterministic activity-on-are networks of the CPM type, where the duration of each activity is a discrete, nonincreasing function of the amount of a single nonrenewable resource committed to it. The first algorithm is based on a procedure proposed by Bein, Kamburowski and Stallmann for finding the minimal number of reductions necessary to transform a general network to a series-parallel network. The second algorithm minimizes the estimated number of possibilities that need to be considered during the solution procedure. Both procedures have been programmed in C and tested on a large set of representative networks to give a good indication of their performance, and indicate the circumstances in which either algorithm performs best.
format Article
fullrecord <record><control><sourceid>kuleuven</sourceid><recordid>TN_cdi_kuleuven_dspace_123456789_101076</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>123456789_101076</sourcerecordid><originalsourceid>FETCH-kuleuven_dspace_123456789_1010763</originalsourceid><addsrcrecordid>eNqVyr0OgjAUQOEOmog_73A3B0PSglCdjcbNQXdS20sECiXtRX18NfEBdDpn-EYs4qmUcZIIOWHTEGrOuchEFrHzqaeqVRZ67zSawWOA0nmgG4KpgvZICG-BoF0gIK8Mxq4sP_5qsYWq-2yNmqBDejjfhDkbl8oGXHw7Y8vD_rI7xs1gcbhjV5jQK42FSNJ1lsvNthBccJmn_8jVb7KgJ6UvpB9OYw</addsrcrecordid><sourcetype>Institutional Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Optimal procedures for the discrete time cost trade-off problem in project networks</title><source>Lirias (KU Leuven Association)</source><source>Access via ScienceDirect (Elsevier)</source><creator>Demeulemeester, Erik ; Herroelen, W.S ; Elmaghraby, S.E</creator><creatorcontrib>Demeulemeester, Erik ; Herroelen, W.S ; Elmaghraby, S.E</creatorcontrib><description>We describe two algorithms, based on dynamic programming logic, for optimally solving the discrete time/cost trade-off problem (DTCTP) in deterministic activity-on-are networks of the CPM type, where the duration of each activity is a discrete, nonincreasing function of the amount of a single nonrenewable resource committed to it. The first algorithm is based on a procedure proposed by Bein, Kamburowski and Stallmann for finding the minimal number of reductions necessary to transform a general network to a series-parallel network. The second algorithm minimizes the estimated number of possibilities that need to be considered during the solution procedure. Both procedures have been programmed in C and tested on a large set of representative networks to give a good indication of their performance, and indicate the circumstances in which either algorithm performs best.</description><identifier>ISSN: 0377-2217</identifier><language>eng</language><publisher>Elsevier science bv</publisher><ispartof>European journal of operational research, 1996-01, Vol.88 (1), p.50-68</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,315,780,784,27860</link.rule.ids></links><search><creatorcontrib>Demeulemeester, Erik</creatorcontrib><creatorcontrib>Herroelen, W.S</creatorcontrib><creatorcontrib>Elmaghraby, S.E</creatorcontrib><title>Optimal procedures for the discrete time cost trade-off problem in project networks</title><title>European journal of operational research</title><description>We describe two algorithms, based on dynamic programming logic, for optimally solving the discrete time/cost trade-off problem (DTCTP) in deterministic activity-on-are networks of the CPM type, where the duration of each activity is a discrete, nonincreasing function of the amount of a single nonrenewable resource committed to it. The first algorithm is based on a procedure proposed by Bein, Kamburowski and Stallmann for finding the minimal number of reductions necessary to transform a general network to a series-parallel network. The second algorithm minimizes the estimated number of possibilities that need to be considered during the solution procedure. Both procedures have been programmed in C and tested on a large set of representative networks to give a good indication of their performance, and indicate the circumstances in which either algorithm performs best.</description><issn>0377-2217</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1996</creationdate><recordtype>article</recordtype><sourceid>FZOIL</sourceid><recordid>eNqVyr0OgjAUQOEOmog_73A3B0PSglCdjcbNQXdS20sECiXtRX18NfEBdDpn-EYs4qmUcZIIOWHTEGrOuchEFrHzqaeqVRZ67zSawWOA0nmgG4KpgvZICG-BoF0gIK8Mxq4sP_5qsYWq-2yNmqBDejjfhDkbl8oGXHw7Y8vD_rI7xs1gcbhjV5jQK42FSNJ1lsvNthBccJmn_8jVb7KgJ6UvpB9OYw</recordid><startdate>199601</startdate><enddate>199601</enddate><creator>Demeulemeester, Erik</creator><creator>Herroelen, W.S</creator><creator>Elmaghraby, S.E</creator><general>Elsevier science bv</general><scope>FZOIL</scope></search><sort><creationdate>199601</creationdate><title>Optimal procedures for the discrete time cost trade-off problem in project networks</title><author>Demeulemeester, Erik ; Herroelen, W.S ; Elmaghraby, S.E</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-kuleuven_dspace_123456789_1010763</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1996</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Demeulemeester, Erik</creatorcontrib><creatorcontrib>Herroelen, W.S</creatorcontrib><creatorcontrib>Elmaghraby, S.E</creatorcontrib><collection>Lirias (KU Leuven Association)</collection><jtitle>European journal of operational research</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Demeulemeester, Erik</au><au>Herroelen, W.S</au><au>Elmaghraby, S.E</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Optimal procedures for the discrete time cost trade-off problem in project networks</atitle><jtitle>European journal of operational research</jtitle><date>1996-01</date><risdate>1996</risdate><volume>88</volume><issue>1</issue><spage>50</spage><epage>68</epage><pages>50-68</pages><issn>0377-2217</issn><abstract>We describe two algorithms, based on dynamic programming logic, for optimally solving the discrete time/cost trade-off problem (DTCTP) in deterministic activity-on-are networks of the CPM type, where the duration of each activity is a discrete, nonincreasing function of the amount of a single nonrenewable resource committed to it. The first algorithm is based on a procedure proposed by Bein, Kamburowski and Stallmann for finding the minimal number of reductions necessary to transform a general network to a series-parallel network. The second algorithm minimizes the estimated number of possibilities that need to be considered during the solution procedure. Both procedures have been programmed in C and tested on a large set of representative networks to give a good indication of their performance, and indicate the circumstances in which either algorithm performs best.</abstract><pub>Elsevier science bv</pub></addata></record>
fulltext fulltext
identifier ISSN: 0377-2217
ispartof European journal of operational research, 1996-01, Vol.88 (1), p.50-68
issn 0377-2217
language eng
recordid cdi_kuleuven_dspace_123456789_101076
source Lirias (KU Leuven Association); Access via ScienceDirect (Elsevier)
title Optimal procedures for the discrete time cost trade-off problem in project networks
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T00%3A59%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-kuleuven&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Optimal%20procedures%20for%20the%20discrete%20time%20cost%20trade-off%20problem%20in%20project%20networks&rft.jtitle=European%20journal%20of%20operational%20research&rft.au=Demeulemeester,%20Erik&rft.date=1996-01&rft.volume=88&rft.issue=1&rft.spage=50&rft.epage=68&rft.pages=50-68&rft.issn=0377-2217&rft_id=info:doi/&rft_dat=%3Ckuleuven%3E123456789_101076%3C/kuleuven%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true