Optimal procedures for the discrete time cost trade-off problem in project networks

We describe two algorithms, based on dynamic programming logic, for optimally solving the discrete time/cost trade-off problem (DTCTP) in deterministic activity-on-are networks of the CPM type, where the duration of each activity is a discrete, nonincreasing function of the amount of a single nonren...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:European journal of operational research 1996-01, Vol.88 (1), p.50-68
Hauptverfasser: Demeulemeester, Erik, Herroelen, W.S, Elmaghraby, S.E
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We describe two algorithms, based on dynamic programming logic, for optimally solving the discrete time/cost trade-off problem (DTCTP) in deterministic activity-on-are networks of the CPM type, where the duration of each activity is a discrete, nonincreasing function of the amount of a single nonrenewable resource committed to it. The first algorithm is based on a procedure proposed by Bein, Kamburowski and Stallmann for finding the minimal number of reductions necessary to transform a general network to a series-parallel network. The second algorithm minimizes the estimated number of possibilities that need to be considered during the solution procedure. Both procedures have been programmed in C and tested on a large set of representative networks to give a good indication of their performance, and indicate the circumstances in which either algorithm performs best.
ISSN:0377-2217