Pollution Problems in Relation to the Thames Barrier

Although the barrier, which is to be constructed about 15 km seawards of London Bridge, need only be closed to exclude exceptionally high tides to fulfil its primary function as a flood prevention device, its design is such that it could be operated as a tide-control structure, closing at a particul...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Philosophical transactions of the Royal Society of London. Series A: Mathematical and physical sciences 1972-05, Vol.272 (1221), p.213-221
Hauptverfasser: Barrett, M. J., Mollowney, B. M.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Although the barrier, which is to be constructed about 15 km seawards of London Bridge, need only be closed to exclude exceptionally high tides to fulfil its primary function as a flood prevention device, its design is such that it could be operated as a tide-control structure, closing at a particular stage during each ebb and opening at a similar stage on the succeeding flood, unless a storm surge is forecast. This paper outlines a theoretical study, undertaken at the request of the Greater London Council, to assess the effect on the condition of the water of the Thames Estuary of operating the barrier on a regular basis in such a way as to prevent water levels landwards of it falling below Newlyn Datum.
ISSN:0080-4614
2054-0272
DOI:10.1098/rsta.1972.0047