Optimizing Restoration Capacity in the AT&T Network
To ensure high network reliability, AT&T employs two basic approaches: preventing failures and responding quickly when failures occur. For AT&T to quickly reroute traffic in the event of a network failure, the network must contain sufficient restoration capacity to carry the displaced demand...
Gespeichert in:
Veröffentlicht in: | Interfaces (Providence) 2000-01, Vol.30 (1), p.26-44 |
---|---|
Hauptverfasser: | , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To ensure high network reliability, AT&T employs two basic approaches: preventing failures and responding quickly when failures occur. For AT&T to quickly reroute traffic in the event of a network failure, the network must contain sufficient restoration capacity to carry the displaced demand. A team of AT&T OR experts, network planners, and managers developed a method for determining the appropriate quantity and location of restoration capacity required to restore the demand during any single link failure. The approach centers on a linear programming model to minimize the cost of the restoration network and uses column generation to generate new restoration paths as needed. In about 10 months, the team converted the methodology into a tool to optimize the allocation of restoration capacity. This tool was then extended to plan for the recovery of a switching-center disaster and to reoptimize the entire restoration network. It has contributed to AT&T's achieving high-quality service, while saving valuable resources. It resulted in hundreds of millions of dollars in cost savings and increased revenues. |
---|---|
ISSN: | 0092-2102 2644-0865 1526-551X 2644-0873 |
DOI: | 10.1287/inte.30.1.26.11621 |