An Experimental Comparison of Techniques for the Assignment of Facilities to Locations

The optimal assignment of facilities to locations is a combinatorial problem that remains unsolved. None of the several optimal-producing procedures is computationally feasible for any but small problems. Three previously proposed heuristic techniques ( CRAFT , one by Hillier, one by Hillier and Con...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Operations research 1968-01, Vol.16 (1), p.150-173
Hauptverfasser: Nugent, Christopher E, Vollmann, Thomas E, Ruml, John
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The optimal assignment of facilities to locations is a combinatorial problem that remains unsolved. None of the several optimal-producing procedures is computationally feasible for any but small problems. Three previously proposed heuristic techniques ( CRAFT , one by Hillier, one by Hillier and Connors) and one new one (Biased Sampling) are examined and experimentally compared for problems of from five departments to 30 departments. The new Biased Sampling procedure is seen to produce the best solutions but at relatively high computational cost. The Hillier-Connors procedure is especially interesting because it is considerably faster than CRAFT and Biased Sampling and its solutions are only 2–6 per cent worse than Biased Sampling and only slightly worse than CRAFT .
ISSN:0030-364X
1526-5463
DOI:10.1287/opre.16.1.150