A watershed-level ecological risk assessment methodology

We present an ecological risk assessment methodology at the watershed level for freshwater ecosystems. The major component is a pollutant transport and fate model (a modified EUTROMOD) with an integrated uncertainty analysis utilizing a two-phase Monte Carlo procedure. The uncertainty analysis metho...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of the American Water Resources Association 1996, Vol.32 (5), p.1039-1054
Hauptverfasser: Hession, W.C. (The Academy of Natural Sciences, Philadelphia, PA.), Storm, D.E, Haan, C.T, Burks, S.L, Matlock, M.D
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We present an ecological risk assessment methodology at the watershed level for freshwater ecosystems. The major component is a pollutant transport and fate model (a modified EUTROMOD) with an integrated uncertainty analysis utilizing a two-phase Monte Carlo procedure. The uncertainty analysis methodology distinguishes between knowledge uncertainty and stochastic variability. The model assesses the ecological risk of lentic (lake) ecosystems in response to the stress of excess phosphorus resulting in eutrophication. The methodology and model were tested on the Wister Lake watershed in Oklahoma with the lake and its trophic state as the endpoint for ecological risk assessment. A geographic information system was used to store, manage, and manipulate spatially referenced data for model input
ISSN:0043-1370
1093-474X
1752-1688
DOI:10.1111/j.1752-1688.1996.tb04072.x