Rapid changeover a prerequisite for responsive manufacture
The ability to effect rapid changeover on a manufacturing line, from one product to another, is a key prerequisite for increased flexibility, lead time reduction and responsive manufacture. However it is a rarity for changeover times to be part of the design specification of a new machine tool or to...
Gespeichert in:
Veröffentlicht in: | International journal of operations & production management 1999-08, Vol.19 (8), p.785-796 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The ability to effect rapid changeover on a manufacturing line, from one product to another, is a key prerequisite for increased flexibility, lead time reduction and responsive manufacture. However it is a rarity for changeover times to be part of the design specification of a new machine tool or tooling system and even when it is, there are few design guidelines for translating the required changeover time into reality. This paper describes a set of design for changeover rules that have been derived from action research, carried out within a variety of companies. The rules address the design of machines, tooling, ancillary equipment and the products themselves and their use has been shown, through case studies, to lead to a significant reduction in changeover time and a leaner, more responsive manufacturing environment. |
---|---|
ISSN: | 0144-3577 |