Preventive Maintenance in a Multiple Shift and High VolumeManufacturing Operation
Shows how to implement a preventive maintenance PM system in a high volume manufacturing operation with a justintime environment. Determines the tasks that are performancecoupled in a specific machine by using a simple flowchart. Computes for every component suitable for PM, earliest economic replac...
Gespeichert in:
Veröffentlicht in: | International journal of operations & production management 1993-10, Vol.13 (10), p.76-83 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Shows how to implement a preventive maintenance PM system in a high volume manufacturing operation with a justintime environment. Determines the tasks that are performancecoupled in a specific machine by using a simple flowchart. Computes for every component suitable for PM, earliest economic replacement time and earliest expected replacement time. Using a time graph, the PM is scheduled for components that are performance coupled in a specific machine. This procedure is straightforward and can be easily followed by plant floor personnel. |
---|---|
ISSN: | 0144-3577 |
DOI: | 10.1108/01443579310045572 |