Priority rules in project scheduling: A case for random activity selection

A heuristic based on random activity selection for finding an optimum solution for resources-constrained problems in project scheduling is discussed. Because the comparative studies conducted so far to find which priority rule gives the best results in all situations have been very inconclusive, thi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Production planning & control 2000-01, Vol.11 (2), p.165-170
1. Verfasser: Akpan, Edem O. P.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A heuristic based on random activity selection for finding an optimum solution for resources-constrained problems in project scheduling is discussed. Because the comparative studies conducted so far to find which priority rule gives the best results in all situations have been very inconclusive, this study has proved the superiority of random activity selection over other heuristics. Considering the fact that this priority rule is found to be inferior in other studies, an extensive literature review is undertaken with a view to ascertaining these findings as related to the present study. A confirmation of this fact is made using an old problem of general application in which other heuristics failed to produce the optimum solution. Another problem is also used for comparative analysis to further confirm the findings.
ISSN:0953-7287
1366-5871
DOI:10.1080/095372800232360