Estimating flowtimes and setting due-dates in complex production systems
This paper presents a methodology for estimating flowtimes and setting due-dates in complex production systems. This is accomplished by modeling flowtime estimation as a forecasting problem, and using the empirical distribution of forecast errors to set job due-dates in production settings with mult...
Gespeichert in:
Veröffentlicht in: | IIE transactions 1995-10, Vol.27 (5), p.657-668 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper presents a methodology for estimating flowtimes and setting due-dates in complex production systems. This is accomplished by modeling flowtime estimation as a forecasting problem, and using the empirical distribution of forecast errors to set job due-dates in production settings with multiple workcenters, multiple servers, feedback queues, and machine breakdowns. Several due-date performance objectives are considered, including cost minimization, attainment of service level targets, and minimization of mean absolute lateness and mean squared lateness. Simulation experiments demonstrate the effectiveness of the method in comparison with both theoretical and empirical methods previously introduced in the literature. |
---|---|
ISSN: | 0740-817X 2472-5854 1545-8830 2472-5862 |
DOI: | 10.1080/07408179508936781 |