Estimating flowtimes and setting due-dates in complex production systems

This paper presents a methodology for estimating flowtimes and setting due-dates in complex production systems. This is accomplished by modeling flowtime estimation as a forecasting problem, and using the empirical distribution of forecast errors to set job due-dates in production settings with mult...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IIE transactions 1995-10, Vol.27 (5), p.657-668
1. Verfasser: LAWRENCE, STEPHEN R.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper presents a methodology for estimating flowtimes and setting due-dates in complex production systems. This is accomplished by modeling flowtime estimation as a forecasting problem, and using the empirical distribution of forecast errors to set job due-dates in production settings with multiple workcenters, multiple servers, feedback queues, and machine breakdowns. Several due-date performance objectives are considered, including cost minimization, attainment of service level targets, and minimization of mean absolute lateness and mean squared lateness. Simulation experiments demonstrate the effectiveness of the method in comparison with both theoretical and empirical methods previously introduced in the literature.
ISSN:0740-817X
2472-5854
1545-8830
2472-5862
DOI:10.1080/07408179508936781