Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops - Part 1
In the first part of this paper, we consider a kanban-controlled flowshop and present recursive equations for time-tabling of containers in a given sequence. The flowshop is characterized by the following: a production batch of a part-type (or job) divided into kanban lots or containers; production...
Gespeichert in:
Veröffentlicht in: | International journal of production research 2000-07, Vol.38 (11), p.2529-2548 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In the first part of this paper, we consider a kanban-controlled flowshop and present recursive equations for time-tabling of containers in a given sequence. The flowshop is characterized by the following: a production batch of a part-type (or job) divided into kanban lots or containers; production kanbans to control the loading of containers on machines or workstations; withdrawal kanbans to regulate the movement of containers between two consecutive buffer storages; periodic material handling of containers; dual blocking mechanisms operative on workstations and material handling; and sequence-dependent set-up times of containers. Considering different types of problems, recursive equations have been developed for time-tabling of containers in a given sequence. |
---|---|
ISSN: | 0020-7543 1366-588X |
DOI: | 10.1080/00207540050031904 |