Experience in the implementation of interfacing work between substation control system to legacy SCADA system in TNB, Malaysia

This paper describes the experience in implementing a telecontrol protocol interface between a substation control system (SCS) and legacy master station in TNB. The core interfacing work is the protocol test. This paper discusses principles and test case design strategies to ensure protocol complian...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Tajul-Arus, Z, Wan-Kamarulzaman, W.A
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper describes the experience in implementing a telecontrol protocol interface between a substation control system (SCS) and legacy master station in TNB. The core interfacing work is the protocol test. This paper discusses principles and test case design strategies to ensure protocol compliance. (4 pages)
DOI:10.1049/cp:20010816