Development of 170 GHz gyrotron for ITER

The new design of 170 GHz/1 MW/50% gyrotron with depressed collector and diamond window is reported. First stage testing of this gyrotron with BN window was completed. Output power of 950 kW and efficiency up to 44% were achieved. Pulse duration of 0.4 s was limited by BN window capacity. BN window...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Myasnikov, V.E., Litvak, A.G., Usachev, S.V., Popov, L.G., Agapova, M.V., Alikaev, V.V., Denisov, G.G., Gnedenkov, A.Ph, Ilyin, V.I., Ilyin, V.N., Khmara, D.V., Kostyna, A.N., Nichiporenko, V.O., Zapevalov, V.E.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The new design of 170 GHz/1 MW/50% gyrotron with depressed collector and diamond window is reported. First stage testing of this gyrotron with BN window was completed. Output power of 950 kW and efficiency up to 44% were achieved. Pulse duration of 0.4 s was limited by BN window capacity. BN window was replaced then with the diamond one and second stage testing started with low power regime. Pulse duration of 20 s was reached at 250-kW power level.
DOI:10.1109/IVELEC.2002.999407