Development of 170 GHz gyrotron for ITER
The new design of 170 GHz/1 MW/50% gyrotron with depressed collector and diamond window is reported. First stage testing of this gyrotron with BN window was completed. Output power of 950 kW and efficiency up to 44% were achieved. Pulse duration of 0.4 s was limited by BN window capacity. BN window...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The new design of 170 GHz/1 MW/50% gyrotron with depressed collector and diamond window is reported. First stage testing of this gyrotron with BN window was completed. Output power of 950 kW and efficiency up to 44% were achieved. Pulse duration of 0.4 s was limited by BN window capacity. BN window was replaced then with the diamond one and second stage testing started with low power regime. Pulse duration of 20 s was reached at 250-kW power level. |
---|---|
DOI: | 10.1109/IVELEC.2002.999407 |