Protection Scheme of a 154-kV SFCL Test Transmission Line at the KEPCO Power Testing Center

This paper presents the design of a protection scheme of a short 154-kV test line with a 154-kV superconducting fault current limiter (SFCL) in the Gochang Power Test Center of Korea Electric Power Corporation. The scheme includes a new protection algorithm proposed by Korea Electrotechnology Resear...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on applied superconductivity 2017-06, Vol.27 (4), p.1-5
Hauptverfasser: Lee, Seung Ryul, Lee, Jong-Joo, Yoon, Jaeyoung, Kang, Yoen-Woog, Hur, Jin
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper presents the design of a protection scheme of a short 154-kV test line with a 154-kV superconducting fault current limiter (SFCL) in the Gochang Power Test Center of Korea Electric Power Corporation. The scheme includes a new protection algorithm proposed by Korea Electrotechnology Research Institute for protecting the SFCL system. The protection scheme is verified by protective coordination simulations on a Gochang power system using PSCAD/EMTDC program in this paper.
ISSN:1051-8223
1558-2515
DOI:10.1109/TASC.2017.2669159