Variations in area- and time-specific marginal capacity costs of electricity distribution

Marginal costs of electricity vary by time and location. Past researchers attributed these variations to factors related to electricity generation and transmission. Those authors, however, did not fully analyze the large variations in marginal distribution capacity costs (MDCC) by area and time. Thu...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on power systems 1998-05, Vol.13 (2), p.560-567
Hauptverfasser: Heffner, G., Woo, C.K., Horii, B., Lloyd-Zannetti, D.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Marginal costs of electricity vary by time and location. Past researchers attributed these variations to factors related to electricity generation and transmission. Those authors, however, did not fully analyze the large variations in marginal distribution capacity costs (MDCC) by area and time. Thus, the objectives of this paper are: (1) to propose a method to estimate MDCC; (2) to demonstrate the significant intra- and inter-utility variations in MDCC; and (3) to discuss the usefulness of these cost estimations in integrated resource planning.
ISSN:0885-8950
1558-0679
DOI:10.1109/59.667383