Distributed generation siting and sizing with implementation feasibility analysis

This paper addresses the problem of distributed generation siting and sizing optimization with subsequent equipment configuration assessment. The proposed methodology is based on the combination of genetic algorithms and indicative analysis, which gives an opportunity to assess power system interact...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Eroshenko, S. A., Khalyasmaa, A. I., Dmitriev, S. A., Pazderin, A. V., Karpenko, A. A.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper addresses the problem of distributed generation siting and sizing optimization with subsequent equipment configuration assessment. The proposed methodology is based on the combination of genetic algorithms and indicative analysis, which gives an opportunity to assess power system interaction with incident infrastructures and take into account technical, economical, regulatory, ecological and other criteria. Two-step algorithm implementation makes the decision process more flexible and comprehensive. The case study is provided for proposed approach verification.
DOI:10.1109/ICPEC.2013.6527749